To carry out your ideas and obtain the desired result from the implementation of construction and finishing work, you must first think about everything well and prepare well.
The first stage will be a compiled detailed plan for upcoming work. In the first part, it is necessary to determine the upcoming work plan that we plan to change in our home, the second part consists of what we need for this. Set the amount of the right material, as well as tools. Depending on how you work in detail on the plan, the final quality and success of the repair will depend. It is necessary to perform the entire “dirty work”: this is the installation of new switches and outlets, carry out welding work on the repair of the heating system, plumbing.
Preparation of walls and ceiling. Work to remove old whitewashing. Necessary tools: ladder, it is mandatory if you need to change plastic windows, brush (mask), roller (long pile), spatula.
With the help of water and roller, it is necessary to wash off the chalk whitewashing. Water must be applied evenly over the entire surface area. It is necessary to repeat this procedure until the desired result is fully achieved. We repeat until the processed surface stops getting dirty, at that moment we can safely assume that the whitewash is completely removed.
Work on the removal of old wallpaper. For this action, you must first wet the wallpaper or steal with an iron. To work with the primer, you will need a spatula, roller and brush. The main task of priming is the coating with a protective film of the working surface from undesirable penetration of paint or glue inside. This contributes to the saving of the materials used. The primer varies into several types: universal, alkyd, water. Using a roller, it is necessary to apply a primer to the work surface. In hard -to -reach places, it is necessary to use a brush instead of a roller.
Plaster serves to align the working surface. The following tools are necessary for working with this finishing material: a small and large spatula, kilma, water. Dry mixture must be poured with water and stir until a single mixture is formed (detailed instructions are on the package of the material). To achieve the best result in mixing, it is recommended to use a drill at low speeds with a special mixer nozzle. However, it must be remembered that the resulting mixture quickly hardens, for this reason the best option would be to prepare small portions.
To work with the following material – putty, you need tools such as: water, dry mixture of putty and putty. The choice of putty depends on the type of surface processed. This finishing material is both dry and ready for use. The main task of plaster is to equalize large differences and irregularities, therefore it is applied with a thick layer. In turn, putty serves to align small irregularities, for this reason it is necessary to apply a thin layer. After the hardening process is completed, you can proceed to further grinding.